Mission Bay Kohimarama Residents Association
  • About
    • Contact
    • Newsletters
    • Links
    • Documents
    • Local Info
    • Guides (member only area) >
      • IT guide
      • Communications
      • Meetings
      • Events Calendar guide
      • Printing
      • Setup for new year
      • Apply for OLB grant
  • EVENTS
  • Recent Projects
    • Auckland Future Growth Strategy – Our Submission
    • Orakei Local Board Plan Feedback – Our Submission
    • Plan Change 78
    • Kepa Road crossing
    • Tagalad Reserve (Mission Bay bowling club land)
    • Seat and Tree project
    • AT safety proposals
    • Meadowbank to Kohimarama Shared Path
    • Selwyn Reserve noise issues
    • Ryman Retirement Village Kohimarama Rd
  • Membership
  • The GREEN
  • Planning

Kepa Road raised pedestrian crossing

Picture
AT has recently changed the pedestrian crossing on Kepa Road near Coates Avenue to make it a raised platform type. The intent is to slow traffic at the crossing, presumably to improve pedestrian safety.

They have certainly achieved the goal of slowing traffic! The crossing bump is so steep that vehicles have to slow to 10-15km/h to avoid hitting the bump uncomfortably hard. This is seriously interfering with the traffic flow.

​We believe that this is not appropriate. Kepa Road is a major arterial route and this elevated crossing is creating a congestion point. It goes well beyond what is required to increase pedestrian safety and is inconsistent with the posted 25km/h warning signs. 

AT response 14 December 2022

24/3/2023

0 Comments

 
CAS-PS8Y2-M1V1T9 - Kepa Road - Pedestrian Improvements Project
Projects (AT) <[email protected]>
14 December 2022 at 11:28
To: "[email protected]" <[email protected]>

​Hi Don,
I refer to your feedback regarding the height of the raised zebra crossing located on Kepa Road, Orakei.

The project team have reviewed the gradient raised pedestrian crossing, which range from 8.2% to 9.2%. gradient.

Our Project Manager has arranged for our contractor to carry out some remedial work on the raised pedestriancrossing ramps.

We appreciate you taking the time to raise your concerns with us.

Kind Regards,
Kristy | Project Assistant

Infrastructure Project Delivery |Integrated Networks
20 Viaduct Harbour Avenue, Auckland 1010
Ph:09 447 4671
Private Bag 92250, Auckland 1142
www.at.govt.nz
0 Comments



Leave a Reply.

    Documents

    Letter to OLB May 2023
  • About
    • Contact
    • Newsletters
    • Links
    • Documents
    • Local Info
    • Guides (member only area) >
      • IT guide
      • Communications
      • Meetings
      • Events Calendar guide
      • Printing
      • Setup for new year
      • Apply for OLB grant
  • EVENTS
  • Recent Projects
    • Auckland Future Growth Strategy – Our Submission
    • Orakei Local Board Plan Feedback – Our Submission
    • Plan Change 78
    • Kepa Road crossing
    • Tagalad Reserve (Mission Bay bowling club land)
    • Seat and Tree project
    • AT safety proposals
    • Meadowbank to Kohimarama Shared Path
    • Selwyn Reserve noise issues
    • Ryman Retirement Village Kohimarama Rd
  • Membership
  • The GREEN
  • Planning